Awarded the change of two rollers for Loeschke Vertical roller mill April 2013 |
Sinoma TCDRI @ Arish Cement company |
|
Started the project to execute all the mechanical installation for equipment and piping for a new polypropylene factory |
Taghleef Industries |
|
Man power supply for plant installation |
KNAUF |
|
Dismantling all lime plant |
Suez Lime |
|
Raw mills jobs (changing the diaphragm plats, spacers and lifters. Replace fixation bolts. Girth Gear Run out) |
NLSupervision |
|
Air slides jobs (change the fabric for 77 + 35 meter. Casing repair for 74.1 meter) |
NLSupervision |
|
ID Fans jobs, line 3 ( steel works + expansion joints) |
NLSupervision |
|
ID Fans jobs, line 4 ( steel works + expansion joints) |
NLSupervision |
|
Preheater jobs (Riser duct, cyclones, chutes and TAD |
NLSupervision |
|
Kiln inlet jobs |
NLSupervision |
|
Jobs for cooler excess air duct |
NLSupervision |
|
Fabricate Rak with dimension (Length 4m * width2.20m * high 3m ) |
|
|
Fabricate Rak with dimension (Length 3.80m * width 1.80m * high 2m ) |
Weatherford |
|
Auxiliary steel structure fabrication and erection |
Thermaxindia |
|
Mechanical fabrication works |
Thermaxindia |
|
Fabricate sheet metals to separator |
Tourah Cement Company |
|
Fabricate sheet metals to separator |
Tourah Cement Company |
|
Kiln 7 S/D kiln feed |
Tourah Cement Company |
|
Shut-down works of Raw Mill – kiln 7 |
Tourah Cement Company |
|
Shut down cement mill12 |
Tourah Cement Company |
|
Overhaul for cement mill 4 |
Tourah Cement Company |
|
Additional work for shut down kiln 7 |
Tourah Cement Company |
|
Improve safety on site p1 and p2 |
Tourah Cement Company |
|
Safety sheet metal work for plant l,ll |
Tourah Cement Company |
|
Maintenance for Cement Mill plant 1 and 2 |
Tourah Cement Company |
|
Kiln 9 shut down ( kiln feed ) |
Tourah Cement Company |
|
Kiln 8 shut down (Rotary kiln ) |
Tourah Cement Company |
|
Kiln 8 shut down ( Kiln feed) |
Tourah Cement Company |
|
Safety improvement works in different Areas |
Tourah Cement Company |
|
Platforms and steel structure for CEMs L7.8.9 |
Tourah Cement Company |
|
Maintenance for packing equipment |
Tourah Cement Company |
|
Repair and cladding sheet metal in preheater |
Tourah Cement Company |
|
Repair expansion joint (SD kiln 7) |
Tourah Cement Company |
|
Install new chimney for bypass |
Tourah Cement Company |
|
Repair and cladding sheet metal in raw mill |
Tourah Cement Company |
|
Supply and install steel structure |
Tourah Cement Company |
|
Transfer main motor |
Tourah Cement Company |
|
Repair and maintenance in crane 5,6 |
Tourah Cement Company |
|
Repair bucket elevator line |
Tourah Cement Company |
|
Change symetro high speed |
Tourah Cement Company |
|
Repair gypsum bucket elevator |
Tourah Cement Company |
|
Fixing the nozzles for calciner kiln7 |
Tourah Cement Company |
|
Install and weld patches kiln 5 |
Tourah Cement Company |
|
Reverse direction of cement mill 7 |
Tourah Cement Company |
|
Change raw mill fan 8 B |
Tourah Cement Company |
|
Reverse symetro cement mill 8 |
Tourah Cement Company |
|
supply and install Scaffolding technician |
Helwan Cement Company |
|
Fabrication of cooling tube |
Helwan Cement Company |
|
Overhaul kiln#6 |
Helwan Cement Company |
|
overhaul Kiln#5 |
Helwan Cement Company |
|
maintenance of slurry mill#5 |
Helwan Cement Company |
|
Change lining and diaphragm plates |
Helwan Cement Company |
|
Overhaul wet kiln#2 |
Helwan Cement Company |
|
Change lining and diaphragm |
Helwan Cement Company |
|
maintenance of raw mill line 2 |
Helwan Cement Company |
|
kiln 6 shut down |
Helwan Cement Company |
|
slurry mill overhaul- pl3 |
Helwan Cement Company |
|
overhaul of kiln # 3 -pl 1 |
Helwan Cement Company |
|
overhaul of cement mill # 1 – PL lll |
Helwan Cement Company |
|
change the girth gear and pinion |
Helwan Cement Company |
|
overhaul kiln 2 plant 1 |
Helwan Cement Company |
|
overhaul kiln 6 plant 1 |
Helwan Cement Company |
|
dismantle, machining and erecting try 5 for kiln# 2- plant 1 |
Helwan Cement Company |
|
replacement scoping device of cm 6 |
Helwan Cement Company |
|
rehabilitation air slide for k. feed 1 |
Helwan Cement Company |
|
rehabilitation bucket elevators |
Helwan Cement Company |
|
Dismantle and erecting 4dumbrs |
Aresco Company |
|
Erection and maintenance Crusher |
Aresco Company |
|
Supply and install Water tank up silo ( Fabricate Tanks 5320mmX4510mm thick10 mm ) |
Suez Cement Company |
|
Supply and install steel structure |
Quattamia Cement Company |
|
Specialist contractor for separators 2515 A/B |
Titan Cement Company |
|
Change the free and fixed BRG for both bucket elevator |
Titan Cement Company |
|
Change waste fan’s motor |
Titan Cement Company |
|
Change kiln’s motor # A |
Titan Cement Company |
|
Change the kiln gearbox’s oil seal |
Titan Cement Company |
|
Change drag chain’s gearbox’s oil seal |
Titan Cement Company |
|
Change the motor for bypass main screw |
Titan Cement Company |
|